Gas

EagleClaw operates over 1.3 Bcf per Day of interconnected processing capacity in the Southern Delaware Basin and has designed a system built to support the robust growth from the Permian for years to come. With over 1,000 miles of low and high pressure steel pipeline, our gas gathering and processing systems provide the reliability and redundancy required to move wellhead gas through our processing facilities to various downstream markets.

EagleClaw Midstream - Toyah

East Toyah Facility

  • East Toyah: 460 MMcf/d of processing capacity
  • Residue outlets: Delaware Link, El Paso 1600, ET Comanche Trail and Oneok Roadrunner
  • NGL outlets:  Lone Star and Targa Grand Prix
EagleClaw Midstream - Pecos

Pecos Facility

  • Pecos: 260 MMcf/d of processing capacity
  • Residue outlets: Delaware Link, El Paso 1600 and Oneok Roadrunner
  • NGL outlets: Lone Star and Targa Grand Prix
EagleClaw Midstream - Pecos Bend

Pecos Bend Facility

  • Pecos Bend: 540 MMcf/d of processing capacity
  • Residue outlets: Delaware Link, El Paso 1600, Oneok Roadrunner and ET Oasis
  • NGL outlet: Lone Star
EagleClaw Midstream - Sierra Grande

Sierra Grande Facility

  • Sierra Grande: 60 MMcf/d of processing capacity
  • Residue outlets: El Paso 1600 and Whitewater Agua Blanca
  • NGL outlet: Targa Grand Prix